Aquapark in Częstochowa

Místo:
Częstochowa
Projekt:
Pracownia Architektoniczna Mariusza Szczuraszek, Pracownia Architektoniczna Piotr Dominiczak
Zhotovitel:
Albudex S.J. Kała, Minkisiewicz i APS-System Sp. j.

Construction of the building at Dekabrystów Street in Częstochowa was completed in autumn 2020. It is a three-storey, building with a basement, and a total development area of 3,200 square meters. The total water surface of the swimming pool complex is nearly 800 square meters. The value of the investment is over 51 million. The Aquapark offers water attractions, a rich SPA area, a playground and a catering area. Mariusz Szczuraszek Architectural Studio and Piotr Dominiczak Architectural Studio are responsible for the project. In turn, the contractors for the woodwork in the water park were Albudex S.J. Kała, Minkisiewicz and APS-System Sp. j.. The façade system FA 50N, fire protection system TM 75EI, window and door system with thermal insulation TM 74HI and cold system PBI 50N were installed.